Find help with thermal imaging of switchboards for Melbourne properties.

Switchboard thermal imaging scans

How a switchboard thermal imaging scan works, what it finds, who should open the board and how to brief a Melbourne thermographer for a commercial site.

A switchboard thermal imaging scan uses an infrared camera to photograph the heat coming off breakers, busbars, cable terminations and fuses while the building is drawing its normal load. A connection that is loose, corroded or overloaded runs hotter than the parts around it, and the camera shows that difference before it turns into a burnt terminal or a tripped site. Independent thermographers and electricians quote and carry out scans booked through this site; the site itself only passes on your enquiry.

Illustrative photo for Switchboard thermal imaging scans

What does a thermal scan of a switchboard find?

Heat in a switchboard comes from current passing through resistance. A good joint has very little resistance, so it sits close to the temperature of the cable and breaker body next to it. A joint that has worked loose, oxidised or been fitted to the wrong torque carries the same current through more resistance, and the extra energy shows up as heat. The scan picks up:

  • terminations on breakers and isolators that are warmer than the matching phase on the same device
  • busbar joints and links that have lost clamping pressure
  • one phase of a three-phase circuit running hotter than the other two, which can point to unbalanced load
  • fuses and fuse carriers with poor contact
  • neutral and earth bars carrying more current than expected
  • cables bundled so tightly that they cannot shed heat

A camera cannot see through a closed steel escutcheon. For the scan to be useful, the covers over the live parts have to come off, which is where safety planning starts.

Who should open the board?

Removing covers from an energised board exposes live parts. WorkSafe Victoria’s electrical safety guidance lists contact with exposed live parts as a main hazard and says employers must, so far as is reasonably practicable, eliminate that risk and use the hierarchy of control. The standard written for this kind of task is AS/NZS 4836, which sets out procedures for safe work on or near low voltage installations and covers arc flash and electric shock.

Ask any provider who will remove and refit the covers, whether that person holds a Victorian electrical licence, and what arc flash protection they wear. Some providers are licensed electricians who also hold a thermography qualification; others send a thermographer with an electrician. Either way, the person handling live covers should be the licensed one.

How the main options compare

Option What it covers Good fit Limits
Visual board check only Labels, signs of burning, missing covers Quick walk-through by a facility manager Misses heat inside joints that look clean
Single board thermal scan One main switchboard opened and scanned Small shop, office tenancy or strata block with one main board Distribution boards elsewhere are not seen
Whole-of-site survey Main board, all distribution boards, motor control centres Factories, shopping centres, larger strata buildings Needs a site plan, access to every room and a full working day for big sites
Survey plus re-scan Survey, repairs, then a second scan of fixed items Sites where the insurer or owner wants proof that faults were closed Two visits to schedule

For insurer-driven work, see the insurance thermography report guide. For pumps, motors and drives that sit outside the board, see electrical plant and motor thermal surveys.

What a provider will need from you

  • the number of main and distribution boards, and where each one is
  • whether the site has a single-line diagram or board schedule
  • the hours when the site runs at its usual load, since a lightly loaded board shows little heat
  • any restricted areas, roof access, plant rooms or tenancies that need keys or escorts
  • whether the insurer has a set report format or wants faults ranked a particular way
  • the last report, if there was one, so items can be compared year to year

Scans are best done when the building is busy. An office board scanned at 6 am on a Sunday may show nothing, while the same board at 2 pm on a hot weekday, with air conditioning running, gives a fair picture.

What the scan and report involve

On the day, the thermographer works board by board. Covers come off, the camera records each section, and a normal digital photo is taken at the same angle so the hot spot can be found again later. Many providers also take a clamp meter reading on the hot circuit, because the temperature rise only means something when compared with how much current is flowing.

The written report usually lists each board, each anomaly, the temperature difference against a reference point, the load at the time and a priority for repair. Two Australian standards sit behind this work: AS ISO 18434.1 gives general procedures for thermography in machinery condition monitoring, and AS ISO 18436.7 sets requirements for qualifying and assessing thermography personnel. Ask what certification the thermographer holds and at what level.

What it costs

The Melbourne thermography firms checked for this page do not publish a set scan price; quotes are built from the number of boards, travel and the report format. Repair work that follows is easier to budget. A 2026 Melbourne price survey puts commercial electrician labour at $100 to $150 per hour, and a commercial three-phase switchboard upgrade at $2,100 to $6,200 when a board is beyond repair. The Melbourne cost guide for switchboard thermal imaging breaks down what pushes a quote up or down.

What a careful provider will not skip

  • Scanning under real load, even if that means a visit during trading hours
  • Refitting every cover and checking no tools or offcuts are left inside the board
  • Recording the load on hot circuits so the result can be judged properly
  • Separating urgent faults from items to watch, rather than marking everything as critical
  • Telling you plainly when a fault needs isolation now

A careful provider will also refuse to open a board that is visibly damaged, wet or showing signs of arcing until it is made safe, and will not tighten connections on live equipment as part of the scan. Repairs are separate electrical work, covered on the hot spot repair and re-scan page.

Melbourne sites

Melbourne’s commercial stock ranges from inner-city towers built over many decades to large industrial estates in the south-east, north and west. Older boards with rewireable fuses and newer boards packed with extra circuits both show up on scans. If you manage property in the industrial south-east, the Dandenong South page covers what is typical there.

What to do next

Count your boards, note when the site is busiest and gather the last report if you have one. Then send a switchboard scan enquiry with the address, building type and any insurer deadline, and an independent provider can come back to you about scope and timing.

Send a job enquiry

Frequently asked questions

How long does a switchboard scan take?

It depends on the number of boards and how easy they are to reach. A single main board in a small building can be done in a short visit, while a factory or shopping centre with many distribution boards may take a full day or longer.

Can a scan be done at night or on a weekend?

It can, but only if the site is under its usual load at that time. A night shift factory suits a night scan. An office building scanned on a quiet weekend may show very little, so most office scans happen on a busy weekday.

Will the scan disrupt tenants or staff?

Usually only briefly. Covers come off one board at a time and the power stays on. Tenants near a board may be asked to clear access, and building management may need to open risers or switchrooms.

Does a clean scan mean the switchboard is compliant?

No. A thermal scan only shows heat. It does not test earthing, insulation, residual current devices or whether the board meets current wiring rules. Those need a separate inspection and test by a licensed electrician.

How often should a switchboard be scanned?

Many sites scan once a year, often to suit insurer renewals, and some insurers accept every two years depending on risk. High load or critical sites may scan more often. Follow your policy wording and your maintenance plan.